The Bend Road Bridge Replacement

The upgrade involved the design and construction of a dual span, dual lane bridge over the Dawson River. The new bridge replaces the existing timber structure and will deliver a new loading of SM1600 and design life of100 years. The scope includes the construction of a temporary side-track to maintain connectivity during the construction and new approach works and widenings.

The scope of works included:

  • Design, final safety in design and all statutory approvals.
  • Demolition and removal of existing bridge
  • Construction of side-track over Dawson River
  • Construction of dual lane bridge
  • All approach works and widenings
  • Erosion and sediment controls