Moura Train Load Out Facility – Truck Bin Backfill

VE Group were engaged by Sedgman Limited backfill a truck dump bin as part of the Train Load Out Facility construction. The project included tying in with existing embankment completed to a profile of approximately 6 meter above existing surface. The projects included the following elements;

  • Managing multiple contractors’ interface
  • Bulk Earthworks
  • Pavement Drainage
  • Pavement works
  • Structural backfill