The upgrade involved the widening of the road to reduce the sharpness of curves and the steepness of the road, and there are wider road shoulders. Extensive earthworks, retaining structures and drainage were constructed on both sides of the road to improve the road stability along the full length of the range.

The scope of works included:

  • Clearing and Grubbing
  • Excavation of 4,000 cubic metres including 1,000 of non-rippable rock.
  • Steel wire gabian protection work over 190 metres to heights up to 2.5 metres.
  • Backfill of rock fill of 1,000 cubic metres
  • Unbound pavements of 650 cubic metres
  • Steel beam guardrail
  • Sprayed bitumen treatments