Butcher Creek Bridge Bridge Replacement

Replacement of an existing bridge and approaches, with the new 2-lane bridge better supporting local traffic by improving safety, flood immunity and traffic flow on Burke Developmental Road. The project also included the realignment of Burke Developmental Road to connect the new bridge to the existing road network. 

The old bridge will be decommissioned once the new bridge is operational. VE Group AU was engaged by CPM to deliver the roadworks component of the project, with CPM delivering the bridge only.

The scope of works included:

  • The scope of works included:
  • Clearing and Grubbing
  • Excavation of 11,000 cubic metres
  • Ground surface treatments over 18,500 square metres
  • Embankments of 2,000 cubic metres
  • Unbound pavements of 5,000 cubic metres